This page defines the terms used on the pages of the cognitive-map line and in the record of the substrate, the two stages of Psyche so far. Terms are grouped by topic. Each definition says what a word means on these pages. None of them describes how the spiking model works; its design is withheld under the disclosure policy. Works cited by author and year are listed in full in the reading list.

Psyche. One open research project that builds brain-inspired components in stages, with artificial general intelligence as its long-term aim. Each stage is built test-first and kept as a citable artifact. The overview is the repository README.

Stage. One step of the project, with its own code, record and claims. Stage 1 is the substrate, the project’s foundation, whose development is paused. Stage 2 is the cognitive-map line described on these pages, which is active. Later stages are not specified publicly yet. How the first stage led to the second is told in Origins.

Artificial general intelligence (AGI). The project’s long-term aim (D-033 in DECISIONS.md). On these pages it is named only as an aim. No component is described as having reached it, and no result is presented as a measured step toward it.

Line. A research line: one body of work within Psyche, with its own question, record and state. There are two so far, the substrate (stage 1) and the cognitive-map line (stage 2). On these pages “the line” means the cognitive-map line unless the text says otherwise. Which line is active and which is paused is the program state, read from the ledger; it says what is being worked on and never what is true of a result.

SCM. The short name of stage 2, which CONTRIBUTING.md gives for the plan titled Cognitive Map Formation and Energy Efficiency in Spiking Neural Networks with Local Plasticity. These pages mostly say “the cognitive-map line” or “stage 2” instead.

Cognitive map. An internal model of how places, or items, relate to one another. Tolman (1948) proposed it to explain maze behaviour in rats that chains of learned stimulus-response associations did not explain. In this line the term names a measurable class of behaviour: behaviour that memorised stimulus-response associations would not explain and an internal model of the environment would. Showing that behaviour on a test is evidence of the behaviour and of nothing more (claims and scope).

The five behaviours below are the tests of the battery. Each is adapted from a classic animal-learning experiment, cited on the battery page.

Latent learning. Learning that takes place without reward and shows in behaviour only once a reward is introduced. Rats that explored a maze without reward, and were then given food in it, soon matched rats rewarded from the start. Battery test T1.

Detour. Choosing a suitable alternative route when a familiar route is blocked, using what is already known about the environment. Battery test T2.

Shortcut. Taking a direct route between two known places when that route has never been travelled. Battery test T3.

Structural transfer. Using structure learned in one environment to learn faster in another that shares its layout but not its observations. Battery test T4.

Transitive inference. Inferring the relation between two items that were never presented together from relations learned one pair at a time: having learned A over B and B over C, choosing A over C. Battery test T5.

Place cell. A neuron in the hippocampus that fires mainly when an animal is in one particular region of its environment, the cell’s place field (O’Keefe and Dostrovsky, 1971). Research question RQ3 asks whether place-like representations emerge in the spiking model without being built in. It is a question, not a result.

Grid cell. A neuron in the medial entorhinal cortex that fires at many locations which together form a regular triangular lattice across the environment (Hafting et al., 2005).

Place cells and grid cells motivate brain-inspired models of map learning. Their existence does not by itself say how a map is learned.

Spiking neural network. A network of model neurons that communicate through spikes: brief, discrete events in time. A model neuron integrates its input over time and emits a spike when that input is strong enough; between spikes it sends nothing. The model of this line is a spiking network. Its cost is expressed as a synaptic-operation estimate.

Neuromorphic hardware. Hardware built around spikes and event-driven operation, as opposed to a conventional processor or a GPU simulating them. The line does not measure on it: measurement on neuromorphic hardware is out of scope, the cost of the spiking model is an analytic estimate of synaptic operations, and that estimate is never set against energy figures reported for neuromorphic chips, nor used for a general claim of efficiency (claims and scope).

Local plasticity. A learning rule that computes the change to a synapse from information available at that synapse, not from an error propagated backwards through the network as in backpropagation, the standard way of training artificial neural networks. The spiking model learns only through local plasticity.

Brain-inspired, biologically plausible. The words the line uses for its model in place of any statement about biology. “Brain-inspired” says where a design idea came from. “Biologically plausible” is used only where it can be argued, and says that a component relies on nothing a neuron or a synapse could not plausibly have. Neither says that animals solve a task the same way.

Model-free reinforcement learning. Reinforcement learning in which an agent learns action values or a policy directly from the rewards it receives, without learning a model of how its actions move it between states of the environment. One comparator family in the battery.

Successor representation. A representation of each state by the expected discounted future occupancy of every state, itself included, under the agent’s current behaviour (Dayan, 1993). It sits between model-free and model-based learning. One comparator family in the battery.

Synaptic-operation estimate. An analytic estimate of how many synaptic operations an agent performs on a task, used as a stand-in for energy. It is computed, not read from hardware: nothing is measured on a chip or a power meter. It is always named an analytic estimate or an analytic lower bound, under stated assumptions. A comparison it supports holds for that task, that measure and those assumptions, and is not a general statement about spiking and conventional networks. The measurement framework reports it for every agent, beside behaviour and internal structure. The rules are in claims and scope; the counting method is withheld until release.

Sensitivity analysis. Repeating a calculation across a range of its assumptions to see which results depend on them. Every energy figure of the line rests on assumptions about the cost of each operation and about what is counted, so it is reported across a sensitivity analysis of those assumptions, and a ranking is stated only if it holds in every setting. Otherwise the text says the comparison depends on assumptions (claims and scope).

Random agent. A reference agent that chooses at random among the actions available to it. It gives the lower bound beside which every result is reported.

Shortest-path oracle. A reference agent that knows the true layout of each environment and always takes a shortest route. It gives the upper bound beside which every result is reported. It learns nothing; it is given the true layout and marks the best a test permits. A test on which the random agent and the oracle do not separate cannot grade any agent.

Seed. The integer that starts a pseudo-random number generator. The same seed gives the same sequence, so a run can be repeated exactly; different seeds show how much a result depends on chance. In this line, every source of randomness gets its own seed, the run’s config records them, and results are reported over several seeds (engineering). A hash seed is different: it fixes Python’s string hashing and is varied in determinism checks.

Bootstrap confidence interval. An interval for a statistic, such as a mean score over seeds, obtained by resampling the observed values with replacement many times, recomputing the statistic each time and taking the central range of the results. It makes no assumption about the shape of the underlying distribution. The line reports uncertainty over seeds this way (engineering).

Bit-exact. Identical bit for bit, not merely equal after rounding. The line compares outputs exactly, because a comparison after rounding cannot see a difference in the last bit of a floating-point number, and that is where an order-dependent sum shows up. The substrate’s record has the case: a one-ULP difference in a float sum, the smallest step between two neighbouring floats, was invisible on one interpreter and changed a result on another (Origins).

Tier. One of three levels at which a result’s reproducibility is stated. Tier A is bit-exact across CPython versions and hash seeds, and covers the environments, the battery, the metrics and the counters. Tier B is bit-exact on CPU for one pinned version, with deterministic algorithms enabled. Tier C is statistical reproducibility for GPU runs: fixed seeds, with results reported with confidence intervals over seeds. Each reported result states its tier, and a result built from parts at different tiers states the weakest of them (engineering).

Permutation test. A significance test that builds its reference distribution by reshuffling labels. The observed difference between two groups, for example the scores of two models, is compared with the differences found when the group labels are shuffled at random many times; the share of shuffled differences at least as large as the observed one is the p-value. It assumes nothing about the shape of the data’s distribution. The line tests differences between models this way (engineering).

Holm correction. A way to keep the overall chance of a false positive in check when several comparisons are made together. The p-values are ordered from smallest to largest. The smallest is compared with the single-test threshold divided by the number of comparisons, the next with that threshold divided by one fewer, and so on, so the strictest threshold applies to the smallest p-value and the last is compared with the single-test threshold. Testing stops at the first p-value that fails. The line applies it across multiple comparisons between models (engineering).

Gate. A fixed point in the plan where a decision is taken against criteria written in advance. Each gate falls at or near the end of a phase, and its decision sets the route the next phase takes. A gate has a public question, criteria written before the work they judge and kept private until submission, and a fallback fixed in advance. Its public status is upcoming or decided. A decided gate shows only the date it was decided and the next step (the line continues to the next phase, extends, or stops), never its verdict. The gates are labelled A to D (gates).

Layer. One of three levels the plan is built in, so that the line does not rest on its riskiest part. The authoritative wording is generated from the plan file on the roadmap.

  • Safe base. The environments, the battery, the baseline comparisons, the analysis and the report. The line stands on it even if the spiking model does not work.
  • Main goal. The spiking model with local plasticity, evaluated on the battery, with an analytic estimate of its synaptic operations.
  • Failure analysis. If the main goal falls short, a documented account of where and why, kept as a result in its own right.

These layers are unrelated to the layers of the substrate’s architecture.

Ablation. An experiment that removes, disables or holds fixed one part of a system and measures what changes, to find out what that part contributes. In the plan, ablations belong to the scaling phase and are part of what the last gate asks for (roadmap, gates). Which ablations are run is part of the experiment plan, which is withheld (disclosure policy).

Pre-registration. Writing down what will be measured and the criterion that will judge the result before the work that tests it, then freezing that record, so that a result cannot reshape the test it is judged by. Changing a frozen record needs a recorded decision with its reason. In this line, pre-registrations stay private until submission, and their dates are made public by hash commitment.

Hash commitment. A way to fix a file’s content publicly without revealing it. A line holding a random nonce is added to the frozen file, the SHA-256 hash of the whole file is published with a date, and the file itself is published later, unchanged, so that anyone can hash it and compare. The nonce stops anyone recovering a short file by hashing guesses until one matches, and a file changed after its commitment no longer matches its hash. The commitments are listed in the disclosure policy and recorded in tools/research_plan.json.

The substrate is stage 1 of Psyche and its foundation: a dependency-free prototype of a memory-and-activation substrate. Its development has been paused since 2026-10-23 under D-031 in DECISIONS.md; its record is in PSYCHE.md and its as-built reference in ARCHITECTURE.md. The terms below come from that record, where the substrate is often called Psyche, the name it carried when it was the whole project. None of them names a part of the spiking model (Origins).

Borrowed vocabulary is engineering lineage, not a claim. Several substrate terms come from cognitive psychology and from research on cognitive architectures: spreading activation, coalition, workspace and broadcast among them, and the emotion words used as labels on roads. In the substrate they are names for engineering components. They record where a design idea came from. They do not claim that a component reproduces the effect or the theory the word comes from. Whether any component has cognitive meaning is decided only on the meaning axis, below, and the substrate makes no cognitive claim.

Store. The substrate store: the component that holds the substrate’s graph of nodes and roads, and the only component that changes it. Every node and road is addressed by a stable opaque id, never by position. Reads are pure: reading a road computes its decayed strength without writing it back. In development, each change is checked for integrity incrementally, and a full integrity scan is available for an offline pass. Module src/psyche_store.py.

Node. The unit of information in the store: a piece of content with a type (event, concept, entity, sensation or abstract), a stable id, and a formation order kept separately from the id, so that ties break the same way in every process. A node carries no emotional label; labels live on roads.

Road. A directed connection from one node to another. There is at most one road per ordered pair, and the reverse direction is a separate road. A road has a strength, which acts as its conductance, grows when the road is crossed or strengthened, can be lowered by an explicit weakening call on the store, and decays with elapsed time. It may carry named charges, each a label with a signed intensity. It may also be closed: a sticky state that only an active crossing changes, never a read and never the passage of time.

Spreading activation. The substrate’s read-only operation that sends activation outward from a start node (the substrate’s code calls it the seed) along its out-roads. Each hop passes on a share set by the road’s strength and by a global per-hop decay; activation that reaches a node by several paths sums; a hop budget and a floor keep the spread local. The spread is expanded one hop layer at a time and its sums do not depend on iteration order, so its result is a deterministic function of the store. The captured run checks this on CPython 3.10 to 3.14 under six hash seeds (the determinism block of tools/ledger.json). A closed road blocks weak activation and lets a small fraction of strong activation through. The operation changes nothing in the store. The term comes from models of semantic memory in cognitive psychology.

Coalition. A group of co-activated nodes treated as one candidate for selection. The substrate forms coalitions mainly from a multi-source activation field. The nodes the input text matched are first grouped by graph proximity, and the field spreads from one representative per group. Each representative’s basin, the nodes it activated more strongly than any other representative did, becomes one coalition. A coalition’s strength is the sum of its members’ activations.

Workspace. The stage that selects one coalition from the candidates, by activation density with a minimum-size guard, and prunes from it the members pulled more strongly toward a region the input did not name than toward the region it did name. Selection is a pure read.

Broadcast. The one bounded write in the substrate’s cycle. It strengthens each road inside the selected coalition exactly once, creates no road and touches no node, and so biases the next cycle. Its bound comes from the saturation of the store’s strengthening rule, not from a clamp. It is off by default; with it off, the whole cycle is a pure read.

Brick. A unit of the substrate’s build plan: a component, a fix, a tool or an attempt at a cognitive claim. Under the project’s process, a brick is specified, tested and verified by an independent tester before anything builds on it. Each brick has a short id, such as 0a for the substrate store, and the ledger records its status. Build and meaning are tracked as two separate axes and are never collapsed into one. The substrate’s three attempts to earn a first cognitive claim were bricks of this kind (the three walls).

Build axis. Whether a brick is built and verified, as a mechanism. Its status names:

Status name Meaning
PROVEN Verified by the full adversarial suite on every interpreter; not a formal proof. For the substrate: determinism, integrity and purity
BUILT-UNVALIDATED Built and tester-verified as mechanism, with no positive meaning verdict
DESIGNED Designed on paper, in a vision document or a specification, and not built
HORIZON Open research, with no agreed definition of done

A brick that is only an attempt at a cognitive claim carries its meaning verdict as its ledger status.

Meaning axis. Whether a brick reproduces a cognitive effect, judged against external data the project did not author, with the prediction and its direction fixed in advance and a baseline. Its verdicts are EARNED, NOT-YET and NO-GO; a stop caught by pre-registration before a graded run is a result in its own right (the three walls). A brick is routinely built and tester-verified on the build axis while its meaning verdict is NOT-YET. No substrate brick holds an EARNED verdict; the meaning bar is open.

Yardstick. A reference from outside the project against which a result is graded, so that a test cannot quietly encode its own answer (rule 5 of the project’s rules). For the substrate it was external data the project did not author, such as human association norms or the machine’s own clock readings. For the cognitive-map line the behavioural paradigms are published, and the published behaviour of each baseline is the reference. The agent-side operationalisation of each paradigm and its pass criteria are the project’s own and are pre-registered privately, so they are not an external protocol for artificial agents. A yardstick the mechanism can both produce and be graded against is what the substrate’s attempts lacked (the three walls).

Wall. The project’s name for each of the substrate’s three negative results: three attempts to earn a first cognitive claim, each stopped before any graded result existed, each for a structurally different reason (circular, mechanism absent, signal flat). The walls are a finding about the substrate and these three yardsticks, not a general law, and a wall never means that the phenomenon is absent, only that it could not be measured under those controls. They are set out in the three walls and carried forward as a checklist in Origins.

Program state. A third axis, separate from the build and meaning axes, that records what is being worked on: the substrate paused, the cognitive-map line active. It never says what is true of a brick, so the pause changed no brick status, meaning verdict or test figure. It lives in the program block of the ledger, and only the project lead changes it, by a new entry in DECISIONS.md.

Ledger. tools/ledger.json, the single source of truth for every fact the substrate’s documents quote: test counts, brick statuses, meaning verdicts, constants and results, plus the program state and the claim terms for the whole project and for the cognitive-map line. Prose cites the ledger; the ledger never cites prose. tools/ledger_check.py fails when a document disagrees with it, uses a status word it does not hold, or asserts one of the project’s forbidden claims; the line’s own terms are checked by tools/publish/check_copy.py. The cognitive-map line keeps its public dates the same way, in one plan file.

Capture. A recorded run of the substrate’s canonical test runner, run_tests.py, saved in docs/TEST_OUTPUT.txt with its date, the interpreters it was run on and the hash seeds swept. The ledger’s test counts are generated from the capture by a tool, never typed by hand. The cognitive-map line applies the same idea to its results: a number it reports must come from a captured results file.

Loop-closed. Describes a test or a check that feeds each stage with what the stage before it produced, not with friendly, hand-chosen input. A component that passes only on input chosen to suit it has not passed. Loop-closure is rule 4 of the project’s rules, and the substrate’s tester suites are adversarial and loop-closed (Origins). It is a property of a test and is not the substrate’s closed cycle, in which a broadcast biases the next cycle.

Lane. The part of the work that one role owns. Psyche has four roles: the architect-pm writes the specification and keeps the roadmap and ledger, the builder implements it test-first, the tester attacks it separately and never edits the code, and the validator runs the pre-registered experiment when a cognitive claim is involved. The lanes do not cross, and the separation is the evidence: a check written by the author of the code shares the author’s blind spots (how Psyche is run).